top of page

Working Bee - Saturday 29 July



Reminder about our next working bee on Saturday 29 July from 9am at the Coolamatong Range.


The list of jobs we are hoping to undertake are below:


HIGH PRIORITY


1. Painting of metal sheeting and wood framing between car park and shooting bays.

Requirements:

  • Paint (has been sourced and will be at the range)

  • Brushes and rollers for corrugated iron sheets

  • 240v or battery powered paint sprayer (subject to weather, otherwise paint rollers)


MEDIUM PRIORITY


1. Staple removal from target frames and backing boards and/or replacement of backing boards

Requirements:

  • Battery powered angle grinder is recommended for this (Hearing protection required)

  • Alternatively, manual staple remover is available

  • Battery powered drill

2. Filling of wombat and rabbit holes around toilet block, water tanks and western side of buildings and on the range and mounds.

Requirements:

  • Wheelbarrow (on site)

  • Bags of cement (on site)

  • Water (on site)


LOW PRIORITY


1. General Maintenance and Cleaning

Requirements:

  • Brooms, cobweb brooms, dust pans, shop wet/dry vacuums

  • Cleaning rags

  • Petrol garden blower (one on site)

  • Pressure cleaner


 

Hope to see you all there!


Please register your intention to attend using the button below.






31 views

Comentarios


bottom of page